It’s Tile Time!!!

THE TIME HAS ARRIVED!!!!

Tomorrow morning, a few gentleman will arrive with a big truck to transport all the tile that I have acquired over the past 8 months. Because I have no chill and lack all patience, I took this as my cue to haul a bunch of boxes over myself and begin the process of unboxing and arranging each wall. At 7:00 AM.

This is the feature wall for the Girl’s Bathroom. I have taken over Daughter #2’s bedroom to arrange the tile.

Tiling will start with the Girls’ Bathroom and the Downstairs Bathroom. I’m basically going to spend my whole weekend laying out tile and it will be glorious.

In preparation for tiling, the shower walls all got treated to some very sticky, very sandy coating this week.

Interior doors were delivered this week and installation is almost complete. I think they’re all in except for the bistro door in the dining room.